CONSTRUCTION OF SAMTREDIA-GRIGOLETI SECTION OF E-60 HIGHWAY (LOT II)
Samtredia, Georgia.Location: Samtredia, Georgia.
Client: TODINI Costruzioni Generali S.p.a.
Total drilling: 1400 m
CPT: 400 m
SPT: 547
- Determining of physical, mechanical properties of soil
Year: 2018
Project gallery